Regulation & Licensing
- Home
- Regulation & Licensing
- OPAL Reactor
- Experts Mission to Review the OPAL Preliminary Safety Analysis Report
- Introduction
- About Regulatory and Policy Branch
- ARPANS Legislation
- Information For Licence Applicants
- Information For Licence Holders
- Incident and Accident Reporting
- Regulatory Guides
- Import and Export Permit Applications
- Relationship with State and Territory Regulators
- National and International Collaborations
- HIFAR Reactor (currently shutdown)
- New OPAL Reactor
- Regulatory Guidance for Radioactive Waste Management Facilities
- ARPANSA's Response to the ANAO Audit Report of its Regulatory Functions
- Integrated Regulatory Review Service - Mission to Australia
quick links
contact
For more information please get in touch with ARPANSA
- +61 3 9433 2211
- +61 3 9432 1835
- email ARPANSA
Experts Mission to Review the OPAL Preliminary Safety Analysis Report
The International Peer Review of the Preliminary Safety Analysis Report (PSAR) prepared for the Replacement Research Reactor (RRR) to be built in Lucas Heights, Australia, was organised by the International Atomic Energy Agency (IAEA).
The main references for the review are the IAEA safety standards related to research reactor safety as well as a selected number of standards related to nuclear power plant site and design safety. Of the latter use was made of the following:
- Safety Series No. 50-SG-D15, Seismic Design and Qualification for Nuclear Power Plants (1992)
- Safety Series No. 50-SG-S5, External Man-induced Events in relation to Nuclear Power Plant Siting (1981)
- Safety Series No. 50-SG-S1 (Rev. 1), Earthquakes and Associated Topics in relation to Nuclear Power Plants Siting(1991)
Errata - Experts Mission to Review The PSAR of the Replacement Research Reactor for ARPANSA (PDF 34kb)